01

NEW ORLEANS

University Medical Center

University Medical Center

On August 26, 2015, hundreds of community members, industry professionals, business leaders and elected officials congregated to celebrate the dedication of University Medical Center (UMC) New Orleans which  opened Aug. 1. 2015. Airo™ Industries, Inc. played an intregal part of supplying floors with needed materials and equipment using the LTD® product.

The LTD® lifts 17.6 times faster than a tower crane at a cost of 3.2% of a tower crane doing the same job.  Since it lifts straight up and down it only requires a very small safety area that is easily marked off.  This makes the LTD®extremely economical and safe while lowering the labor cost by delivering construction material to the work force faster which significantly reduces “lost” labor hours waiting for construction material. The University Medical Center  finished construction 33% sooner than they would have without the LTD®.  Check out our Media Page for a video testimonial from one of the LTD® operators on this University Medical Center project.

SARASOTA

Memorial Bed Tower

02

Memorial Bed Tower

The LTD® was used on this $250 million improvement project for the Sarasota Memorial Bed Tower.   The nine-story structure replaced 220 beds and operations.  It was more than a decade in planning and construction and opened in April, 2013.  The LTD® can lift loads to every floor beneath the hoist AND on the roof with accessory decks making the LTD® SERIES the most efficient hoist in the world.